top of page

WEEK 5: FINAL PITCH




Monday 21st


Today is the day we present to our clients at MAC.


I came into class at 9 am and began preparing, starting with the vector works issue where last minute I realised that most of the file was unsaved. ButI managed to fix in half an hour thanks to guidance of Lee, our technician. I was feeling nervous and confident at the same time; nervous because I don't want to miss any details out of the pitch considering I have to deliver it in 5 minutes without sounding rushed; confident because I put in the work, all my content is ready with hours left to practice my speech. Although all that practice made my brain tired, I should have practiced yesterday then rested. Despite fumbling a bit and going over the 5 minutes I'm really glad with how things tuned out.


WHERE TO IMPROVE: REST AND ENSURE I SAVE FILES PROPERLY


ADD PHOTO/VIDEO






THE PITCH


1.

2.

3.

4.

5.

6.


7.


8.

9.

10.


11.

12.

13.

14.

15.

16.



17.

18.


19.


20.

21.

22.

23.

24.

25.

26.

27.





 




Wednesday 23rd




Report Submission :




© 2023 Blog by Serrell Tafari

bottom of page